SPE Extrusion Division 1-0-Wiki

RSS

Navigation

Extrusion 1-0-Wiki Pages

Search the Wiki
»

Viewing/Creating

Account Management

Administration

Brought to you by:
The SPE Extrusion Division
Board of Directors


PoweredBy
Extrusion Trials
Vol.19 #3, Nov. 1992

In an extrusion characterization test, be sure you wait long enough after each change for equilibrium to be established. The time you wait to take data is most important for accurate melt temperature measurements.

With modern temperature control systems, you should expect to wait approximately 5 to 6 minutes for each inch of screw diameter for full thermal equilibrium to be established, e.g., 50 60 minutes for 10 inch diameter screw. You can check this by following melt temperature or die pressure changes with time.

See also:
  • Data collection 1
  • Extrusion data sheets
  • Melt temperature
  • Plot extruder performance
  • Simulations

Return to Extrusion Hints
Some of the icons were created by FamFamFam.